Jemez Pueblo Library
  Sacred Power Corporation has installed a 2.8 kW grid-tied system on the Jemez library roof. Sacred Power also conducted an energy efficiency audit on old and new portions of the library building.

 

 

 

 

 

 
 
Home| SP Dealers | About Us | Manufacturing Site | Products | Projects | Press Releases | Contact
 
© 2004-2006 Sacred Power Corporation. All Rights Reserved.
Go to SPC Sol-Park Go to SPC Tel-Sol Go to SPC SP-Hybrid Go to SPC SP-Midi Go to SPC SP-Bubbly SP Sol-Park SP Tel-Sol SP-Hybrid SP Midi SP-Bubbly Go to SP Sol-Park Go to SP Tel-Sol Go to SP-Hybrid Go to SP-Mini Go to SP Bubbly